Burbank EV charger rebate: what BWP pays and how to qualify
Burbank Water and Power (BWP) pays Burbank residents up to $1,500 toward buying and installing up to two home charging stations, including an additional amount when a panel upgrade is needed. Here is how the program works, from BWP's own page.
Last reviewed: , against BWP's rebate page.
Rebate amounts
The amount depends on the charger type, whether a panel upgrade is required, and whether the home is in a disadvantaged community (DAC).
| Charger type | Charger rebate | Panel upgrade rebate (additional) |
|---|---|---|
| Standard charger | $200 residential $300 DAC | $750 residential $900 DAC |
| Smart charger | $500 residential $600 DAC | $750 residential $900 DAC |
You cannot claim the panel upgrade rebate without a charging station rebate.
Who is eligible
All BWP residential customers, including tenants and residents of single-family and multi-family homes. Multi-family building owners who install chargers for tenants apply for BWP's Commercial EV Charging Station Rebate instead.
The steps, as BWP lays them out
- Hire a licensed contractor. They choose the location with you and inspect the panel and circuits to see whether a panel or circuit upgrade is needed.
- Call BWP if you need a new panel. BWP Service Planning, (818) 238-3647, as soon as possible. BWP checks whether its side of the service needs an upgrade too.
- Check the charger qualifies. Review the technical requirements in BWP's program terms and FAQs before buying.
- Install, permit and inspect. The work must be permitted and pass inspection by Burbank's Building & Safety Division. The permits go in with the application.
- Apply. Download BWP's rebate application and send it with the required documents. Processing may take 4 to 6 weeks.
Where we fit in
We do the load check, flag early whether a new panel is needed (so the BWP Service Planning call happens first), handle the Burbank permit and inspection, and give you the finaled permit and an itemized invoice for your application. You submit the application to BWP.
VoltGen Energy operates under Akopi Builders, CSLB #1112420. Electrical work is performed by licensed C-10 electrical contractors. Check the license at CSLB.
Last reviewed: . Sources: Burbank Water and Power, Residential EV Charging Stations Rebate; BWP rebate application. Programs change. Check the official page before you rely on an amount.
EV charger installation in Burbank · Panel upgrades · EV charger installation cost
Burbank rebate questions
Can tenants get the Burbank rebate?
Yes. BWP says the program is open to all BWP residential customers, including tenants and residents of single-family and multi-family homes. Building owners installing chargers for tenants apply through BWP's commercial program instead.
Can I get the panel rebate without a charger rebate?
No. BWP says you cannot claim a panel upgrade rebate without receiving a rebate for an EV charging station.
How long does BWP take to pay?
BWP says processing may take 4 to 6 weeks after you submit the application.
What is a DAC customer?
A customer in a disadvantaged community, as defined by the California Environmental Protection Agency (CalEPA). BWP's rebate page links to CalEPA's page for it. DAC customers get higher amounts.
Planning a charger in Burbank?
Call before you buy. We will check the panel and tell you which rebate tier the job is likely to fall into.